SSDEIR - Highlighted Sections Link Page

Volume 1 - Main Document
Including:

Table Of Contents
MEPA Certificates
Acronyms and Abbreviations
1.0 Overview
2.0 Massachusetts Permitting Requirements
3.0 Project Alternatives
4.0 Dredging and Water Quality
5.0 Dredged Material Management
6.0 Wetlands
7.0 Drainage
8.0 Water Supply
9.0 Waterways / Chapter 91
10.0 Marine Fisheries
11.0 Public Safety and Security
12.0 Transportation
13.0 Air Quality
14.0 Historic and Archaeological Resources
15.0 Comments and Circulation
16.0 Proposed Section 61 Findings / Mitigation Summary


Volume 2
Including Appendices:

3-1 Alternatives Site Analysis, Safety and Environmental Impacts (10/14/05)
5-1 Draft Phase IV Remedy Implementation Plan
5-3 Draft Conceptual Model for Taunton River Sediment Deposition and Distribution of Contaminants
5-4 Chemistry and Leachability Testing of Taunton River Sediment
5-11 WCE Summary of Tier III Sediment Analysis (4/11/05)
5-12 Sediment Suitability Determination (9/28/05)


Volume 3
Including Appendices:

6-1 Salt Marsh and Freshwater Wetland Mitigation Plan
6-2 Coastal Dune Documentation
9-3 Mill River Pipeline - Taunton River Crossing Supplemental Analysis
10-1 Estimation of Ballast Water Entrainment of Fish Eggs and Larvae Associated with Operations of Weaver’s Cove LNG Project
10-2 Monitoring Sediment Resuspension Processes within a Boston Harbor CAD Cell during Passage of a Deep-Draft Vessel - SAIC, 2001
10-3 Shellfish Mitigation Plan (9/15/05)
12-1 Transportation Needs Analysis
12-2 Traffic Analysis - Bridge Transits
12-3 Transportation Mitigation, Draft Letter of Commitment